Pan Abode Cedar Homes

Address1100 Maple Ave. SW
City & StateRenton, Washington
ZIP Code98056
Tel425-255-8260
Fax425-255-8630
Emailinfo@panabodehomes.com
Web Sitewww.panabodehomes.com
Primary Contact
Contact NameTom Prevette
TitleBusiness Development
Tel425-430-1546
Fax425-430-9167
Emailtomp@panabodehomes.com
Secondary Contact
Contact NameRon Davis
TitleEstimating & Purchasing
Tel425-255-8260
Fax425-255-8630
Emailrond@panabodehomes.com

Company Type:

Manufacturer

Products & Services:

Others

Language Info:

English
Main Products
Prefabricated cedar buildings
Main Services
1. Custom Structural Design and Material Package Manufacture & Supply
2. Construction Support and Guidance to Local Dealer Representatives and Builders
Description

Since 1952 Pan Abode Cedar Homes has been bringing wood homes and buildings to life with innovative designs, cutting edge engineering, quality materials, and creative structural product applications. All of our projects feature wood systems and accents, particularly Western Red Cedar, one of nature’s finest building materials. We offer a choice of three distinctly different building systems and a multitude of product and system options to create your home or building projects, all of which provide exceptional efficiency and responsible life cycle use of resources (Green).

Regardless of the size or style, the common denominators of every Pan Abode project are meticulous design, manufacturing craftsmanship, personal service, product quality, and the beauty of wood. In addition, there are distinct advantages to working with Pan Abode’s structural systems approach to construction:

1. Custom design & plans development are included.
2. State of the art engineered components are utilized at our customer’s direction.
3. Materials are quality assured.
4. Materials are net or precision sized and grouped for an efficient construction process.
5. Supply logistics are consolidated and managed in a systematic process.
6. Job site savings in labor and time are realized (fewer people, less skill, less time).
7. Job site waste and disposal are minimized (materials net or precision sized).
8. Maximum cost control achieved (material price lock, fewer project variables).